Margaret Kulpa
Abacus Technology
This article discusses the 10 most common misconceptions the author has had to
overcome concerning software process improvement and the Software Capability Maturity
Model. Topics include management vs. developer changes required, having standards in
place, consensus vs. steamroller approaches, keeping it simple, and why you cannot expect
software process improvement to work unless you give your employees time to do it.
ost organizations that start out on the road
toward software process improvement (SPI) using the Capability Maturity Model (CMM) for
Software have no clue what this endeavor means. Most managers get sold on the idea based
on competitive practices within the industry"keeping up with the Joneses."
This article discusses some common misconceptions about the torturous path to achieving a
maturity level.
"What, me change? You've got
to be kidding!"
Managers think the CMM focuses on changing the way the developers work. What happens is
that the CMM forces management to change the way it manages projects. By requiring the
development team to collect project data and report it to management, management becomes
more aware of the project management process. In some organizations, managers do not want
to know in detail what is really happening on their projects. The idea that someone would
report to them actual schedule slippages and try to determine a standard deviation becomes
incomprehensible. It is not uncommon to shoot the messenger.
What the CMM really provides is the ability to shape your own
destiny. By generating procedures to do work, you control your work environment. If
management understood that, they probably would not start CMM activities.
"We can't do this. We have
to support our users."
It is amazing how often supporting the users is used as an excuse to not do CMM work. The
CMM absolutely advocates supporting your users. That is why we are in this business. In
case we have forgottenno users, no work. Ultimately, by following CMM guidelines,
supporting the user becomes easier because the ground rules have been established.
Change involves not only the developers but also management and
the user community. No matter your position, your attitude plays an important role in SPI.
For example, the way you do work in your twenties should be different from the way you do
work in your forties, or at least it should be based on learning. If you are still doing
things the way you always have, you need to re-examine your work and probably your
lifeand you are probably not the best person to be put in charge of the improvement
effort. CMM work is all about change, something such people apparently know nothing about.
Users also need to change. Your users do not have the right to
kill you, but that is what they are doing to our aging work force by creating unnecessary
stress that contributes to heart attacks, cancers, and other ills. Control is the real
issue. People who believe they have some control over their lives tend to be happier and
live longer (so say the psychologists). So, to gain control of your project, you must
control your users. Why should you accept an "emergency" request at 4 p.m.
Friday that will keep you at work all night? Especially when it turns out that that
particular user always turns in an "emergency" request at 4 p.m. on
Friday and does not need the information until later the following week? Those users need
to be trained in becoming pro-active and basically getting their act together. If
everything is an emergency, nothing is an emergency. This sounds like an area in need of
improvement.
"Standards? We don't need
standards!"
Nowhere in the CMM does it say that standards are required. The CMM does not absolutely require
anything. The model is not a step-by-step how-to modelit is a framework, a
guideline. It tells you what you need to do but not how to do it. However,
the CMM presupposes that you have standards and are trying to follow them. The standards
they presuppose you already have are for products like coding standards, templates for a
requirements specification, or test case scenarios.
Following standards institutes a basic structure within an
organization. So, if you do not have any standards, get some. One place to search is
Department of Defense (DoD) military standards, even if you are not a DoD organization.
Start searching the Web for military standards as well as for the methods used to
implement SPI. They are available, and they are free.
Just do not be anal when you interpret this information (see item
10, "Keep It Simple"). And all standards should be tailored for use in your
organization. Do not think that you can use the same standards you used from the place you
used to work in your new workplace. They do not fit. They cannot be used. They can be used
as a target, but you will need to tailor them.
"Everybody knows what the
process is. What's the big deal?"
Everybody knows what a process is until they try to define it in detail and write
procedures that describe how to follow the process. Then, they shift back to documenting who
needs to do something rather than on how that something is done. They also fall
back on product standards (a form for documenting defects found during peer reviews)
instead of process standards (how to perform the peer review, how to detect
defects, and how to complete the form). Telling me that "it is the project
manager's responsibility to determine schedule estimates" does not tell me how that
manager is supposed to derive those estimates.
"Collaborative and achieving
consensus
"
CMM teams usually try to work collaboratively and make decisions by consensus. This
concept is great and fosters buy-in and ownership but is extremely time-consuming and
expensive. Consensus is not majority rules. Consensus means that everyone can live
with the decisionthey may not love it, but they can live with it. This way of
working takes time. If you are on a tight schedule, (CMM work always is) you may need to
stop the philosophizing and touchy-feely stuff and steamroll some folks. You will never
get 100 percent buy-in from everyone. Take what you can get, and get those procedures
written down.
"The CMM requires that a
good process be in place."
No. It requires that a process be in place that is documented and followed. At first, your
process could be awful. That is where the "continuous process improvement"
concept comes in. After you hammer out a process, it is piloted, and projects start to use
it, refinements will be made until (it is hoped) the process becomes "good." But
to start, get something down on paper and use it. Clean it up as you go.
"We need to model our as-is
process in order to create our to-be process."
Yes, but I find that organizations take up to a year to do this, only to find that their
processes are too ad hoc to be used as a baseline of good practices and lessons learned. I
suggest doing a software capability evaluation (which is now done for internal software
process improvement) or a CMM-based Appraisal for Internal Process Improvement. These
assessment methods can quickly determine consistent practices across the organization as
well as strengths and weaknesses. Measurable action plans can be generated based on the
results. Tracking progress can also be measured. The thing to remember before starting CMM
activities is to determine ahead of time how to measure success. Modeling current
processes is greatbut will you ever see a return on that investment?
"Tie CMM activities to your
business objectives."
Of course. There are some things in the CMM that may not make sense for you. For example,
having a separate group to do software quality assurance (SQA) may not work if you only
have 10 people in your company. The challenge is to figure out a way to perform quality
assurance reviews and oversight in an objective, independent manner. And do not confuse
"organization" with "company" or enterprise. An organization achieves
a maturity level ratingnot one project, not an entire company. Without going into
detail, an organization generally consists of three to eight projects reporting to
the same person, like a director or a division headnot an entire company (like IBM).
Do not get stupid about "business objectives."
Ultimately, most organizations' business objectives are to achieve Level X by a certain
date. If you are not currently doing SQA and do not want to do SQA (because of the cost
and because it is overhead) yet you must achieve the level, do not try to be clever and
tailor SQA out of the CMM process. Any certified evaluation team will catch you.
"Better, cheaper,
faster."
This really irks me. When the CMM was written, most organizations had not yet begun the
downsizing frenzy. Nowadays, however, organizations have cut their staff to the bare
minimum. Management loves the maxim "better, cheaper, faster" and eventually,
you will be able to turn out software of better quality, more quickly, and less
expensivelybut not at first! The average time to obtain your return on
investment is three to five years.
SPI is expensive. Most organizations either hire outside
consultants to start the journey or build it from the inside. Even if you are not hiring
consultants, taking people away from coding, i.e., "real work," and having them
do SPI costs you time, money, and schedule slippage. So management instead assigns SPI
work in addition to existing work to an organization with extreme resource constraints,
and it fails. You cannot squeeze additional effort from people who are already overworked.
And having these people "work weekends, holidays, I don't care what it takes"
violates the CMM principle of establishing and following reasonable plans.
"Keep it simple."
I like this one. Most organizations start off believing that they can keep their
procedures simpleuntil they try to do it. Writing procedures that are simple and
easy to follow, yet are thorough and complete, is extremely difficult. That is why the
people on your teams need to be able to write and like to write as well as have a
technical background and knowledge of the organization.
Managers in organizations today seem to feel that one person can
wear many hats, i.e., a Powerbuilder programmer can also write procedures for how to write
a requirements specification. Do you know what happens when you ask that unfortunate
"techie" to do that? He breaks out in a cold sweat. Although some people are
adaptable and can do many jobs, not everyone can do everything well. Different skill-sets
are required for different jobs.
Another problem is that teams often catch the improvement fever.
They want to improve everything. The challenge is to stay focused and use the CMM for
software as your guide, but do not attack more than you can handle at one time. Remember:
SPI is continuous improvement. It is iterative. Do what you can do in the time allotted,
then go back and pick out more things once you have been allocated more time to do them.
Conclusion
Although there are other points to ponder when attempting this journey down the CMM path,
these are the most frequently found errors made that I have documented. Good luck on your
journey.
About the Author
Margaret Kulpa is a consultant with Abacus Technology Corp. in Chevy Chase, Md. She
is a certified lead evaluator and is authorized to teach the SEI's Introduction to CMM and
the Software Capability Evaluation class. She has performed SPI duties for over 15
corporations and has evaluated over 30 organizations. She has also written and taught Key
Process Area classes for Levels 2 and 3.
Abacus Technology